WAYNE COMBUSTION SYSTEMS801 GLASGOW AVE.FORT WAYNE, IN 46803ELECTRIC SHOCK HAZARDOVERHEATING HAZARDHIGH VOLTAGES ARE PRESENT IN THIS EQUIPMENT.FOLLOW
9ADJUSTMENT OF BURNERStarting the burner:1. Depress the gas valve control knob on the combination gas valve and turn to “OFF”. Figure 9.2. Set room th
10P265DI - JUNCTION BOX ROTATEDP265DI
11All adjustments below must be made with the following instructions:1. Draft Gauge 3. CO Tester2. O2or CO2Analyzer 4. Water Column GaugeAfter the bur
12GENERAL INSTRUCTIONGas burners require the services of an experienced technician for proper setting and adjustment. If the burner does notappear to
13P 265-EP, P265F-EP, P250AF-EPINTERMITTENT PILOT INSTRUCTIONFOR HONEYWELL SYSTEMSTARTING BURNER1. Depress the gas valve control knob on the combinat
14IMPORTANT: The electronic S8600 Control Module cannot be repaired. If troubleshooting procedure indicates a malfunction inthe S8600 the S8600 Contro
15S8600, S8610 TROUBLESHOOTING GUIDENOTE: Before troubleshooting, familiarize yourself with the start up and checkout procedure.Check line voltage po
16P250AF/P265-DIDIRECT SPARK IGNITIONHONEYWELL SYSTEMStarting the burner:1) Turn the gas valve control knob to “OFF”, wait five minutes.2) Turn gas
17TROUBLESHOOTINGAlthough the following tests can be made using standard volt meter, it is quicker and more convenient to use a FenwalModel 05-125539
18To measure flame current, first shut off the power to the system and then remove the flame sensing lead wire form theelectrode terminal and insert a
1These instructions were prepared for the guidance of those installing this particular gas conversion burner. While thy apply inprinciple to all inst
19P265P265FP265EPP265FEP1 Air Tube & Housing Assy. 5” (127mm) Burner 62715-001 • •1 Air Tube & Housing Assy. 8” (203.2mm) Burner 62715-003 • •
20P250AFP250AF-EPP250AF-DI1 Control Box Assembly 62296 • •1 Power Cord Assembly 60182-002 • •1 Transformer 60186-003 • •1 Relay 60187 • •1 Control Box
21PARTS LIST - P265/P265F SERIES GAS BURNERS62903-001 Control Box/Strap Assembly 1 • • • • •••••60182-002 Power Cord Assembly 1 • • •60186-004 Transfo
22PARTS LIST - P250AF SERIES GAS BURNERS62903-001 Control Box/Strap Assembly 1 • • •60182-002 Power Cord Assembly 1 •60186-004 Transformer-24V 1 • • •
23Notes
24 MSR & MSR-DC 22019-003 Rev. C 08/15/00LIMITED WARRANTIES FOR OIL AND GAS BURNERS, MADE BY WAYNE ANDUSED IN RESIDENTIAL INSTALLATIONSWAYNE COM
2FLUE PIPE AND CHIMNEYThe flue pipe should be carefully inspected and replaced if necessary in connection with installation of a draft hood. Allinsta
3FIGURE 2FIGURE 3FIGURE 41/2” (12.7 mm)Minimum rise 1/4” (6.35mm) to the foot (.305 m)Minimum rise 1/4” (6.35mm) to the foot (.305 m)Minimum rise 1/4”
4PREPARATION OF FURNACE OR BOILERClean combustion chamber thoroughly. Scrape and brush all heating surfaces and flue ways. Soot and fly ash are exce
5COMBUSTION CHAMBERSThe combustion chamber sizes given in Figure 5 are based on the maximum rated BTU capacity. If the input is to bepermanently set
6NOTE: The BTU input valves on the preceding page show the approximate hourly input of the burner for the various drillsizes shown. To determine th
7ELECTRICAL WIRINGThe power burner is shipped completely wired. It is only necessary to supply the 115 volt circuit, thermostat and limit circuit.All
8After the piping and meter have been checked completely, purge the system of air. Do not bleed the air inside the furnace.Be sure to relight all the
Kommentare zu diesen Handbüchern